Free engineering tools
Tools
Quick checks for engineers and contractors. Results are estimates; final sizing should be verified by a licensed electrical engineer.
Voltage drop check
Result
2.18%
8.71 V drop on 400 V
Within 3% limit
Estimate only. Copper resistance at 75 °C (21.7 Ω·mm²/km); reactance ignored, so results for large cables run slightly low. Verify final sizing with a licensed electrical engineer.
Monthly electricity bill estimate
Estimate
₱36,144
per month at the rate above
Saving 20% ≈ ₱7,229 per month, ₱86,746 per year
Default rate: Meralco overall rate, October 2026 (₱15.06/kWh, BusinessWorld, 13 Oct 2026). Commercial and industrial tariffs differ.
Book an energy audit